High Speed Feather Down Jacket/Suit Making Machine
High efficiency filling means creating more value for down jacket factory. And our automatic filling machines will help the down jacket factory to improve their filling efficiency, get higher filling quality.
Model No.
|
SCR-2P-6G
|
||
Filling Materials
|
Dry down70%-90%
|
||
Down Storage Volume(kg)
|
10~12kg
|
||
The Number of Filling Port
|
A total of 2, 1/each side
|
||
Multiple nozzle size(mm)
|
16 or 19
|
||
The Number of Scale
|
Total 6, 3/each side
|
||
Cycle Number
|
3
|
||
Accuracy Grade
|
0.01g
|
||
Weighing Error
|
Generally control within ±0.03g, Max error less than±0.1g
|
||
Weight Range(g)
|
0.1g ~30g
|
||
Air Pressure Monitoring System
|
√
|
||
Humidification System
|
√
|
Our Advantages
1. The display accuracy is 0.01g that means save more materials;
2. The power is 1.5 kw and compared with old machine it will save more electric;
3. Down is Circulated in a closed environment, it improves the environment of working place;
4. The operation is simple and one filling machine’s efficiency is equaled 3-4 skilled workers;
5. Good stability, the key components of filling machine are imported ;
6. Using air pressure to fill, which prevent down to be damaged in the filling process
7. OEM service can satisfy customers more
Our Details
1. Patent design makes filling freely for both breathable fabric and non-breathable fabric. And also prevent down going out from the stitches.
2. Advanced suction device can adsorb feather to improve the environment of work place .
3. Our machine were approved by CE.
4. Down filling machine have automatic warning system. It will reminds operator if the machine does not work properly.
5. Three scales on each side are out of feather in turns and it improves the efficiency of making down clothing.
XIDO’s down filling machines are able to updated, then the filling machines can fill feather and ball fiber.
The upgrade spends you about $1000, but one set could fill two different materials. You don’t need to buy two machines, this could help you save the cost and the space.
Machine Parts
Name: Filling Port
Brand: XIDO
Original: China
Filling port on filling machine:Special design;to convenient breath freely;to prevent out of feather from cut-parts.
Machine Parts
Name: Foot Pedal
Brand: XIDO
Original: China
It makes operating easier.Foot pedal as a switch to control the filling work.
Machine Parts
Name: Key Buttons
Brand: XIDO
Original: China
Down filling machine have automatic warning system.It will reminds you if the machine not work properly.
Main Features
Name: Touch Screen
Brand: XIDO
Original: China
The touch screen which can save up to 100*100 data enable both single quantity filling and multiple quantity filling.
The 4 steps to produce a high accuracy down jacket via XIDO down jacket filling machine
|
Import Material
Using motor to import down and feather to storage box. Filling material: duck down, duck feather*, goose down, goose feather*, milkweed velvet, ball fiber, fake down and etc
Set Up Target Weight
Set up target weight in program, filling range is 0.1g – 30g, the max filling weight of home textile filling machine is 80g/filling
Start Prepared
Press the button “automatic”, filling machine can be in ready state automatically.
Step the Pedal to Fill
Put the fabric piece to the filling port and hold it in right way, then step pedal, the target weight down is filled into the fabric piece. Filling in this way, it can fill 1800grids/hour/port.
*:70% up
Engineer Avaiable
XIDO provides the engineers if the customers need. We can install the equipment for customers and teach customers how to use it.
Visit Factory
Welcome to visit our factory any time if you have any hesitation.
Sincere Cooperation
We will continue to provide service after you buy our equipment. We seek long-term coorperation rather than one-off cooperation.
FAQ
Q: Are you trading company or manufacturer ?
A: We are trading company and we have our own factory. Our trading company is in Qingdao, and our factory is in Jiangsu. Welcome to visit our factory.
Q: Are your installation service free?
A: No, the customers need to bear the airfare, visa fee and accommodation. Our engineers usually need 3-4 days for installation and training.
Q: What is your terms of payment ?
A: 30% in advance, and the balance payment need to pay off before shipment
Q: How do you make our business long-term and good relationship?
A:We provide good quality machines and service to our customers. We respect every customer, and we hope to establish long-term cooperation relationship with you.
Any Questions Are Welcome!
Whatsapp:0086 18053208561
Email:[email protected]
Leave a Reply